Stacked piston hydraulic unit
Three ring pistons stacked in one steel body, fed by a single port. A complete file set a machine shop can quote and cut from: 9 machined pieces, toleranced drawings and a machining guide covering every operation.
Tensioner prototype being manufactured in China. Arrival estimated 27 November 2026.
- UK patent filed
- PCT filed
- CNC turning
- Hydraulics
- C45 / 40Cr steel
- DFM review
- machined pieces
- 9
- machined pieces
- unique parts
- 6
- unique parts
- drawing sheets
- 5
- drawing sheets
- turned and drilled
- 100%
- turned and drilled



Bill of materials: 9 machined pieces
6 unique parts, each with its own STEP file and drawing. Repeat parts run from one program.
ITEM 1Body
C45 seamless tubeMade from tube instead of solid bar, bored from one side in a single setup.
ITEM 2QTY 2Cup
C45Face O-ring groove on the bottom, oil feed hole drilled from the OD.
ITEM 2bTop cup
C45Same program as the cup, plus one OD seal groove.
ITEM 3QTY 3Plunger
40Cr, Q+TThree identical pistons, all seal grooves on outside diameters.
ITEM 4Top ring
C45Threaded ring that clamps the stack. Thread cut to fit, no gauge needed.
ITEM 5Thrust sleeve
40Cr, Q+TCarries the full output force out of the unit.
Designed to be cheap to cut
- Body machined from seamless tube, not solid bar: less material, less cutting time.
- General tolerances everywhere except a short, listed set of sealing and fit features.
- Fit on assembly: bores are measured, mating parts turned to suit. No grinding, honing or lapping.
- No internal O-ring grooves. Every seal sits on an outside diameter or a flat face.
- Only two drilled features in the whole unit. The oil gallery is a turned gap, not a drilled passage.
- Repeat parts from one program: three cups and three identical pistons.
The complete file set
- 01STEP model of the assembly plus one STEP per part
- 02Five dimensioned PDF drawing sheets with BOM
- 03Tolerance sheet for each part, listing only the controlled features
- 04Machinist’s guide: stock sizes, operation route, assembly and test steps
- 05Seal schedule with standard O-ring and backup ring sizes
Have a part or assembly like this?
Send a sketch, photo or existing CAD. Fixed quote within 24 hours.